Laundromat Construction- Trenching
This location was a Laundromat previously so most of the infrastructure is complete but due to some layout changes, there is some concrete that needs to be cut.
The new drain, vent connection and electrical.

Some of the starting pictures. Notice the paint line on the floor indicating the customer area to the right and the dryers in the cleaner strip and the dryer access area against the left wall.

Water heater and lint trap room.

The start of the trenching.

Some old shelves left from the previous store. It’s handy to keep these around during construction to store tools, fittings and other items on.

This is the old attendant room. The electrical panel is in the back right corner. This room will be reduced in size and re-framed for the change machine, camera DVR, and other secure storage.

Stay tuned as we continue with the renovations.
Ken